Ōmokoroa Southern Industrial Road and stormwater pond
About the project
To cater for the growing need for industrial zoned land, we will be constructing 360m of industrial road. This is on the southern side of Ōmokoroa Road heading east.
The relevant consents for this project have been approved and we are finalising the documents for this project to go to tender in June.
What to expect next:
- We expect to advertise the tender in June and complete the construction by 2023.
- Parallel to the construction work we are investigating the construction of a stormwater pond within the existing gully system as a permanent solution to accept stormwater from the new industrial road and the upper catchment areas. This will also provide stormwater drainage for the future industrial subdivision.
- The investigation and construction of the stormwater pond will not affect the construction of the Industrial Road.